Deprecated: Array and string offset access syntax with curly braces is deprecated in /var/www/wp-content/plugins/gravityforms/common.php on line 4151
Engineering Room Renovation
April 5, 2022
Engineering Room Renovation
In December, Mr. Bishop announced the capital campaign for the Foundation.  For the 2021-2022 school year, the Foundation will fund the furnishing of a new multi-purpose space at NHS.  When the current NHS location was built in 2001, the space functioned as an engineering room with many individual workspaces.  With a move to collaborative education, a need for the 3DE program to have a presentation space, and a need for the school to have a multi-function meeting area, the current space is being remade into a functional work environment for students, staff, and even the community to work collaboratively.  Renovations will begin in late spring and are scheduled to be completed by 2022-2023 school year.  Be on the lookout for exciting updates as the project progresses.     
cá cược đơn giản | cầu vip kubet | mẹo đánh cầu bạch thủ | soi kèo nhà cái | chơi cược an toàn | mẹo cá cược bóng đá | mẹo chơi kubet | mẹo đánh cầu bạch thủ | nạp tiền kubet | tài khoản kubet

Get Involved